Recently, Maersk has implemented a Peak Season Surcharge (PSS) effective November 23 for cargo from Far East Asia to the Mediterranean that falls within the scope of the announcement; for non-SPOT bookings, applicability is determined based on the Price Calculation Date (PCD). The Pacific Maritime Association (PMA) announced on November 21 that it has reached a tentative agreement on a new contract with the International Longshore and Warehouse Union (ILWU) Local 26 covering approximately 250 watchmen at the Port of Los Angeles and the Port of Long Beach.

I. Maersk Peak Season Surcharge for Far East Asia–Mediterranean Route Applies from November 23
On November 4, Maersk issued an announcement implementing a Peak Season Surcharge (PSS) on cargo originating from the Far East Asia origins listed in the announcement and destined for Mediterranean destinations. The announcement also states that cargo transshipped via Mediterranean ports as the final port of discharge to other European destinations may also fall within the scope of application. The surcharge is USD 750 per container for all 20-foot equipment and USD 1,500 per container for all 40-foot and 45-foot equipment. The announcement covers the listed origins in multiple countries and Mediterranean destinations, and applies to various equipment types, including standard dry containers, high-cube containers, reefer containers, open-top containers, flat-rack containers, and tank containers.
The surcharge applies to the origins, Mediterranean destination ports, and designated container types listed in the announcement. Rules for determining the pricing date: for non-SPOT bookings, the PCD for non-FMC cargo is the planned departure date of the first leg of ocean transport at the time of booking confirmation; the PCD for FMC cargo is the last container gate-in date.
⚠️ It is worth noting that, as of today, quotations and bookings must be recalculated based on the country of origin, port of discharge, container type, and booking type. This surcharge is a route-specific charge, and the above amounts do not include other potentially applicable local charges, contingency surcharges, and other route charges. The final charges shall be subject to the specific booking confirmation and Maersk's invoice.
For dangerous goods and tank container cargo, it is also necessary to confirm in advance whether the carrier accepts carriage, the dangerous goods approval requirements, equipment availability, and the applicable basis for the surcharge.

II. Strike Risk at Los Angeles/Long Beach Ports Temporarily Averted; Agreement Still Pending Membership Ratification
According to a November 21 announcement by the Pacific Maritime Association (PMA), a tentative agreement on a new contract has been reached with the International Longshore and Warehouse Union (ILWU) Local 26 covering approximately 250 watchmen at the Port of Los Angeles and the Port of Long Beach. The agreement is still subject to a ratification vote by Local 26 members, and the current contract will remain in effect and be extended until the ratification process is completed. It should be clearly noted that this tentative agreement covers only approximately 250 watchmen and is not the collective agreement for all dockworkers on the U.S. West Coast.
With the tentative agreement reached, the previously imminent strike risk has been significantly alleviated; however, the agreement is still pending membership ratification, and the final contract has not yet been formally concluded.
Relevant logistics arrangements via the Ports of Los Angeles and Long Beach can currently proceed as planned, while we continue to monitor the vote results of Local 26 members and the latest developments at the terminals and among shipping lines.Hanyue International will continue to monitor route developments and provide customers with timely logistics information and reference solutions for dangerous goods transportation.

